Asphalt Paving of the Road Section from Kikolo Market

Location

Angola - Luanda

Description

The asphalt paving project of the road section from Kikolo Market/Ponte Cerâmica to Paraíso PUNIV, in the municipality of Cacuaco, spans approximately 8.2 km. It is part of the Integrated Municipal Intervention Plan (PIIM), aimed at improving the flow of people and transportation of various products from Cacuaco to Cazenga Municipality.

The project includes:

Two traffic lanes, each 3 meters wide Parking lanes of 1.5 meters Sidewalks with a minimum width of 0.50 meters Surface drainage systems Roadbed preparation Sub-base and base layer construction Sidewalks Surface drainage for rainwater Rigid pavement (concrete) wearing course Installation of horizontal and vertical signage.

top

Office

Sin El Fil – Lebanon
2nd Floor Parallel Center
Luanda – Angola
Casa 2, Rua 16/17 / Nova Vida

Got a project in mind?