Supervision of the Construction of the Deck and Reinforcement of the Foundations of the Bridge in the 4 de Fevereiro Neighborhood, 500 Houses – Cacuaco Municipality, Luanda Province (Phases I, II, and III)

Location

Angola - Luanda

Description:

The project involved the construction of a mixed (metal and concrete) bridge 30 meters long over the waterway passing through the 4 de Fevereiro neighborhood in the 500 houses area. Both abutments are made of reinforced concrete and form a single body that supports the metal deck. The abutments are founded on micro-piles 26 meters deep.

top

Office

Sin El Fil – Lebanon
2nd Floor Parallel Center
Luanda – Angola
Casa 2, Rua 16/17 / Nova Vida

Got a project in mind?