Asphalt Paving and Lighting of the Camâra/Cangote to Monument Cemetery Road Section
Location
Angola - Bié
Project Narrative:
The project involved the construction of 400 social housing units, social facilities, and internal and external infrastructure, including commissioning, testing, and maintenance during the warranty period in the new urbanization of Soyo II.
The project includes:
Two traffic lanes, each 35 meters wide, with 15-meter sidewalks
Surface drainage systems in concrete ditches
Roadbed preparation
Base layer construction
Sidewalks
Surface drainage for rainwater
Flexible pavement (bituminous) wearing course
Installation of horizontal and vertical signage
Public lighting