Asphalt Paving of the EN 250 Section from Bairro Azul II to the 500 Houses
Location
Angola - Bié
Project Narrative:
The project, spanning approximately 465 km, is part of the Integrated Municipal Intervention Plan (PIIM) and aims to improve the flow of people and transportation of various products in Cuito municipality.
The project includes:
Two traffic lanes, each 35 meters wide, with 1.5-meter sidewalks
Surface drainage for rainwater
Roadbed preparation
Sub-base layer construction
Base layer construction
Sidewalks
Flexible pavement (bituminous) wearing course
Installation of horizontal and vertical signage