Location

Water Fountain 1: Mbanza Kongo – Kilumbo

Water Fountain 2: Mbanza Kongo – Ntetembua

Water Fountain 3: Mbanza Kongo – Santa

Water Fountain 4: Mbanza Kongo – Madungo

The Project Include

All 4 fountains are composed of: Water fountain, Technical area and WC, Water supply area, Laundry area

Requalification Project of 4 Water Springs

Description

Description Of the 4 Fountains:The water is collected from the existing fountain into the new fountain created in each area. This water will pass to the water supply area and the laundry area following a mechanical system and the used water will be drained to the valley. A concrete trench is created at the border of the area to prevent the flow of rainwater.