Supervision of the Construction of the Deck and Reinforcement of the Foundations of the Bridge in the 4 de Fevereiro Neighborhood, 15 Houses – Cacuaco Municipality, Luanda Province (Phases I, II, and III)
Supervision of the Construction of the Deck and Reinforcement of the Foundations of the Bridge in the 4 de Fevereiro Neighborhood, 15 Houses – Cacuaco Municipality, Luanda Province (Phases I, II, and III)
Location
Angola - Luanda
Description:
The project involved the construction of a mixed (metal and concrete) bridge 30 meters long over the waterway passing through the 4 de Fevereiro neighborhood in the 14 houses area. Both abutments are made of reinforced concrete and form a single body that supports the metal deck. The abutments are founded on micro-piles 26 meters deep.